The vast majority of customers feel that applying for fire control procedures is the responsibility of the interior decoration company. In fact, it is not. The office decoration company is responsible for part of the interior decoration of the basic decoration, and the fire control procedures must be undertaken by the fire safety agency of technical specialty. At this time, some customers will want to find the fire agency company, but also have to account for the costs, which is not as good as going to the Security Bureau to apply for fire control procedures immediately. The opinions of the left and right are generally small and lose a lot. If you want to apply for the fire-fighting procedures for office decoration, you will have to pay for the fire-fighting agency company at the end of the day.

 

 

1. Fill in the application form for fire safety review of overall planning of internal decoration design of engineering buildings and application form of fire safety review on site of Beijing construction, and keep in mind that the application enterprise should be the construction unit, not the construction enterprise. The construction unit is required to seal and provide the rental contract or house purchase agreement. If the construction enterprise is to solve the problem, only say it.

2. The wrong filling content in the declaration form is the key decorative building materials, such as partition wall material / pavement material / wall top material.

3. It is required to prepare photocopies of engineering drawings for fire safety inspection of all personnel in the site (generally available in property management services).

4. During office decoration, it is required to prepare detailed plane design drawings, electrical drawings, and fire protection transformation drawings of the construction site (if no fire-fighting equipment is used, it can be indicated in the remark name). The engineering drawings need to be printed on the overall planning and stamped with seals by enterprises with overall planning qualification certificate (such as engineering and architectural planning and Design Institute).

5. The local fire brigade will visit the site within 10 working days and put forward written suggestions clearly. If you agree, you can start construction. If you don't, you may have to adjust the office decoration plan.

6. Two weeks before the end of the decoration design, the application form for fire safety inspection of engineering buildings can be sent. The contents and the declaration form are mutually related. Generally, the fire brigade will check 2-3 kinds of decorative building materials, and the inspection cost is about 3500 yuan (the most likely one is PVC pipe, solid wood board, window cloth, carpet, gypsum board, mineral wool sound-absorbing board, etc.).

7. If the inspection is up to the standard, at least 2 persons of the construction unit will sign up for the fire safety training (Compulsory), and the training fee will be 800 yuan / person (there is a slight difference in the cost estimates across the country).

8. When the project is completed, the fire brigade will make another inspection on the spot. It will list some rectification plans and follow them. Then, it will issue a fire safety inspection approval to the construction unit.

Related articles

 Shanghai gudu office decoration design company  Shanghai gudu office decoration design company  Shanghai gudu office decoration design company  Shanghai gudu office decoration design company  Shanghai gudu office decoration design company  Shanghai gudu office decoration design company
 Click to quote
 Quotation tips

 Quote button

Toll free telephone number

021-60314742

x