保山附近有没有服务

 Shanghai gudu office decoration design company

 Shanghai gudu office decoration design company ​​

How to operate the procedure of fire protection in office decoration

Published on: September 29, 2020 16:43 Times

Shanghai office decoration The procedures and procedures for fire control are as follows:


1、 Declaration
1. Construction workers
2. Business license and qualification certificate of design company. (the owner is the owner, which shall be stamped with the official seal of the design company and the construction unit)
3. Power of attorney; (if the owner is the owner, the official seal shall be stamped)
4. House property certificate; (if the construction unit is the owner, the official seal shall be affixed)
5. House lease contract; (if the construction unit is the owner, the official seal shall be stamped)
The business license of the construction unit is stamped with the official seal;
7. Handle fire protection design certificate in advance;

2、 Property:
1. Copy of the contract (including quotation); see the property demand;
2. Construction drawings (water, strong and weak electricity, partition, plane, general control, size, top surface, ground, spray, smoke detector, air conditioner,)
3. Copies of business license and qualification certificate of construction unit;
4. Fire fighting report form;

3、 Street newspaper
1. Copy of the contract (including quotation);
2. Business license, qualification certificate, work safety license and organization code of construction company;
3. Operation certificate for special type of work, electrician certificate and welding certificate;

4、 Completion acceptance
1. As for the construction party's completion drawings, the blueprint shall be sealed with the completion seal, and the white drawing shall be sealed by the owner and the property owner;
2. Fire proof certificate of relevant materials (fire extinguisher, safety sign, emergency light, carpet, glass, gypsum board, etc.)
3. Fire fighting filing application form for completion acceptance of construction project; (the construction unit in the header is the owner, which shall be stamped with official seal)
4. Business license, qualification certificate, work safety license and organization code of the construction company; (if the construction unit is the owner, it shall be stamped with official seal)
5. List of fire protection products; (if the owner is the owner, the official seal shall be stamped)
6. Completion acceptance report; (if the owner is the owner, the official seal shall be stamped)
7. Acceptance certificate of fire protection design record of construction project; (if the construction unit is the owner, it shall be sealed with official seal)
8. Power of attorney; (if the owner is the owner, the official seal shall be affixed)
9. Seal of design unit;
10. The business license of construction engineering unit shall be stamped with official seal;
11. List of fire protection products and materials (for emergency exit, fire extinguisher can be stamped with the construction company's seal according to the picture, and the fire extinguisher shall be provided with overall qualification certificate);
12. Acceptance record of concealed works;
13. Fire control is not activated, and the facilities are qualified

Related articles

 Shanghai gudu office decoration design company  Shanghai gudu office decoration design company  Shanghai gudu office decoration design company  Shanghai gudu office decoration design company  Shanghai gudu office decoration design company  Shanghai gudu office decoration design company
 Click to quote
 Quotation tips

 Quote button

Toll free telephone number

021-60314742

x